This is not the latest approved version of this apprenticeship. View the latest version

This apprenticeship has been retired

Key information

  1. Status: Retired
  2. Reference: ST1330
  3. Version: 1.1
  4. Level: 3
  5. Options: Power industry overhead linesperson - distribution, Power industry overhead linesperson - transmission
  6. Typical duration to gateway: 30 months
  7. Typical EPA period: 6 months
  8. Route: Engineering and manufacturing
  9. Integration: None
  10. Maximum funding: £27000
  11. Date updated: 28/10/2024
  12. Lars code: 740
  13. EQA provider: Ofqual
  14. Example progression routes:
  15. Review: this apprenticeship will be reviewed in accordance with our change request policy.

This apprenticeship has options. This document is currently showing the following option:

Contents

Contents

Content loading...
Content loading...
Content loading...

Version log

Version Change detail Earliest start date Latest start date
1.2 Occupational standard and end-point assessment plan revised. 25/02/2025 Not set
1.1 End-point assessment plan revised. 28/10/2024 24/02/2025
1.0 Approved for delivery 30/11/2023 27/10/2024
Employers involved in creating the standard: Balfour Beatty, Electricity North West, M Group Services, Morrison Utility Services, Northern Power Grid, National Grid, Scottish Power, SSE, UK Power Networks, Western Power

Crown copyright © 2025. You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. Visit www.nationalarchives.gov.uk/doc/open-government-licence

Is this webpage useful?

Thank you for your feedback

Tell us about your experience